Your contractor’s quote. AI‑checked.

Upload a quote to check for missing details, unclear terms and questions worth asking—before you sign.

Backed by real-world cases.

See an example

Check your quote

0 / 10000
Drop a PDF here or tap to choose one
Printed quotes, scanned documents, marked-up PDFs — all work.
0 / 15000

Your review is written in the language of the quote: an English quote gets an English review, a Hebrew quote a Hebrew one.

Who is this quote for?
Privacy notice: Remove names, addresses, and phone numbers before uploading. Do not upload confidential documents.

Free and instant, no sign-up. Your quote is not stored or shared.

Reading your quote…

Example review

A sample bathroom quote and the kind of review OkToSign gives it. This is an illustration — your review is based on your own quote.

Sample quote

  1. Bathroom remodel
  2. Replace the existing bathtub with a walk-in shower.
  3. New vanity, toilet and floor tiles.
  4. Materials included.
  5. Total price: $18,000.
  6. 50% deposit before work starts.
  7. Extras will be discussed if needed.
  8. Start date: as soon as possible.

Highlighted lines are the ones the review refers to.

Bathroom remodel

Not ready to sign

Waste removal isn’t mentioned.

The old tub and fittings come out, but nothing in the quote says who removes and disposes of them. That is often charged separately.

Not found anywhere in the quote. Related line: Replace the existing bathtub with a walk-in shower.

Ask the contractorDoes your price include removing and disposing of the renovation waste?

Half the price is due before work starts.

Once most of the money is paid, you have less leverage if the job is delayed or something goes wrong.

In the quote: 50% deposit before work starts.

Ask the contractorCan we pay a smaller deposit and the rest at agreed stages of the work?

Extras have no price.

Small changes during the job can turn into charges you never agreed to.

In the quote: Extras will be discussed if needed.

Ask the contractorWill every extra be priced and approved by me in writing before the work is done?

Settle these in writing before you sign.

What the review gives you

Money risks

Missing scope, payment traps, unclear extras, vague timelines — the things that actually cost money later.

Questions you can send

Questions you can send to the contractor right away by WhatsApp or email, without an awkward confrontation.

Real patterns

Not generic AI advice. Guided by a library of real contractor problems — what actually goes wrong, and why.

How it works

  1. 1

    Paste, upload or drop

    Text quote, PDF file, or WhatsApp conversation. Messy is fine.

  2. 2

    Get the risks

    The things that can cost money, ranked by impact and checked against real cases.

  3. 3

    Send the questions

    One tap opens WhatsApp with the question already written.

  4. 4

    Sign with confidence

    Know exactly what needs to be in writing before you commit.

“The most expensive part of a contractor quote is often what’s missing from it.”

Who is this for?

  • Homeowners before renovation
  • Building and condo committees
  • School and facility managers
  • Anyone approving contractor work
  • First-time buyers doing fit-out